KENSINGTON CONSTRUCTION REACHES 2ND FLOOR

rendering1

Construction at The Kensington started in September 2012 and is well underway with the building structure now reaching the second floor level. The Kensington is scheduled for completion in the summer of 2013 and it is expected the first owners will be moving in during June 2013. With over 50% of the units sold out there is still a good selection of suites to choose from.